Entire new en suite bathroom was created and installed on the first floor (before there was only one bathroom, on the ground-floor). Installation of a new kitchen and of the bathroom on the ground-floor. Complete renewal of the facade of the house. Window was changed into two spacious double glass PVC doors to create a French balcony on the ground-floor. New double glass PVC windows were installed on the ground-floor and first floor. Renewal of the plumbing and of the central heating system. Implementation of new Electrical System to ensure it was updated accordingly with current Dutch Regulations and it had capacity to supply safely energy to the house. Repainting of all doors, windows and other woodwork. All walls and ceilings were plastered and painted. A new floor was installed.