Renewal of the plumbing and installation of an entire new central heating system to replace the old gas driven heater. Implementation of new Electrical System to ensure it was updated accordingly with current Dutch Regulations and it had capacity to supply safely energy to the apartment. Installation of a new kitchen, and renewal of toilet room and bathroom (including installation of a new double glass PVC window). Repainting of all doors, windows and other woodwork. All walls and ceilings were plastered and painted. A new floor was installed.