The removal of the old kitchen and changing of the plumbing and electricity to fit the new kitchen. The door and frame towards the kitchen is placed more to the right to increase the use of space in the kitchen. The kitchen is installed. The renovation of the toilet, including rotating the frame and the door 180° to allow the door to open in the opposite direction. Afterward the tilling was done and a floating toilet bowl and sink were installed. New stainless steel stairs were installed to connect the 1st and the 2nd floor of the duplex. A new HR+++ PVC window was installed. Implementation of new Electrical System to ensure it was updated accordingly with current Dutch Regulations and it has capacity to safely supply energy to the house. All walls and the ceiling were plastered and painted. A new floor was installed. Repainting of all doors, frames and other woodwork.