Complete renovation of bathroom and toilet. 2 walls were demolished. Afterward all walls and the ceiling were repaired, plastered and painted. A new floor was installed. Repainting of all doors, windows and other woodwork. Plumbing and electricity was adjusted for the installation of a kitchen in a new location. Composite wood-look floor installed on the balcony.